Phase 2

The map shows a construction zone in and around the Museum of Art parking lot. It shows Campus Drive closed in that area. It also shows a sidewalk being built along the north side of the Hinckley Center.

Click to see a higher-resolution map

 

North Campus Drive will be closed permanently to through traffic on May 2, 2015. The drive will end at the entrance to the Museum of Art parking lot, which will remain open during construction. Heritage Drive will remain open permanently and during construction as an access to the Wilkinson Student Center north parking lot near the Harris Fine Arts Center. However, the through street between Heritage Drive and North Campus Drive will be permanently closed.

More information about the 2015 project.

As BYU has shared its plans for the three phases of construction, it has emphasized that all outlines are the best current estimates and some adaptations may be necessary.

Read about Phase 1

Read about Phase 3